Port-to-port against door-to-door
On our China–UK desk the working figures are 28–35 days FCL, 32–40 days LCL, 5–8 days by air and 22–28 days by rail and road. All of those are port-to-port. What you actually need to know is when the goods can be sold — and that means adding booking waits, clearance and delivery slots. Door to door normally runs 6 to 20 days longer than the number on the quote.
An importer asks how long China to the UK takes, the forwarder answers "30 days", and the two are usually talking about different things. The forwarder means the sailing — departure from the load port to berthing at the destination port. The importer means the date the goods can go on sale. Between those sit three stretches of time that rarely appear on a quotation: the wait from booking to sailing, customs clearance and collection after discharge, and inland delivery plus any warehouse booking slot.
The table below separates the two. Port-to-port is our actual carrying range on the China–UK lane, the same figures published on our China–UK service page. Door-to-door is where shipments most commonly land once both ends are included. Both are experience ranges, not commitments.
| Mode | Port to port | Typical door to door | Suits | Least controllable step |
|---|---|---|---|---|
| Ocean FCL | 28–35 days | 34–49 days | Volume cargo, low to mid value, planned replenishment | Peak-season rollovers, port congestion |
| Ocean LCL | 32–40 days | 42–60 days | Less than half a container, no deadline | Consolidation wait, co-loaders' clearance |
| Air freight | 5–8 days | 7–14 days | High value, low volume, stock-outs and first samples | Peak-season capacity, battery screening |
| Rail + road | 22–28 days | 27–40 days | Mid value, hitting a restocking window, too costly by air | Fixed departures, mainland-to-UK transfer |
Port-to-port measured from Shenzhen Yantian or Shekou to Felixstowe or Southampton; air from Shenzhen or Hong Kong to Heathrow or Manchester; rail via China–Europe services to Germany and onward by road to the UK. Actual timings depend on the sailing, departure and space confirmed at the time of booking.
Everything that makes door-to-door longer than port-to-port happens before the vessel sails or after it discharges. In the order it occurs:
"The usual misunderstanding is not that the forwarder quoted a slow service. It is that the sailing time on the quote was read as the arrival date. Between those two numbers sit one to three weeks."
Full containers carry the bulk of this lane, and outside peak season the 28–35 day range holds up well. The risk is not at sea but at two points: peak-season rollovers, where tight space means the carrier pushes a booked container to the next sailing and loses you seven to ten days; and port congestion — Felixstowe is the UK's largest container port, and industrial action or system outages back up both discharge and collection. Neither is within a forwarder's control, but both are mitigated by booking outside peak windows and having clearance documents ready in advance.
LCL is 4 to 5 days behind FCL on the sailing itself, but the door-to-door gap opens to a fortnight or more, and all of it sits at the two ends. You wait for consolidation at origin, and at destination however well prepared your own paperwork is, you wait for the slowest consignment in the container. We have had shipments with complete documents held nine extra days because another consignee in the same container was selected for examination. Once your volume approaches a 20ft load, price the full container too — the unit cost may be close, but the certainty is not.
Shenzhen to London is a little over twelve hours in the air, but we quote 5 to 8 days because that figure covers collection into the origin warehouse, screening, space confirmation, discharge, UK clearance and final delivery. Two things stretch it: peak-season capacity, and the nature of the goods — batteries, liquids, powders and magnetic items face stricter screening and acceptance conditions, and incomplete documentation stops the shipment at origin. Declare these characteristics at booking rather than discovering them at the warehouse door.
China–Europe rail terminates on the European mainland, so a UK shipment continues by road across the Channel — making this a rail and road multimodal service rather than pure rail. The 22–28 day range saves roughly a week against ocean freight, with three caveats worth knowing in advance: departures run to a fixed schedule rather than daily; each additional transfer adds a point of uncertainty; and acceptance conditions for restricted goods are tighter than by sea. Its natural place is mid-value cargo that must hit a restocking window but cannot carry air freight rates.
When advising clients we can usually settle this on three questions, before looking at price at all:
One combination comes up constantly in practice: send the bulk by sea and air a small first batch. That protects the on-sale date while keeping most of the freight cost on the ocean leg. For product launches and peak-season builds it is the most common answer of all.
The most common and the most avoidable. A UK broker needs the invoice, packing list, bill of lading, EORI and commodity codes — all of which can be assembled and sent on the day of sailing. With documents ahead of the cargo, the declaration can be filed as soon as the goods land. Start collecting them after berthing and the back-and-forth alone costs two or three days, often eating into free time. Write "clearance pack to the destination broker within 24 hours of sailing" into your own process — it saves more time than switching transport mode ever will.
Vague goods descriptions, a strained commodity code, or a declared value that does not match the invoice all raise the likelihood of examination markedly. Once selected, the timing is entirely out of your hands and storage and detention charges follow. The probability is what you can control: describe the goods specifically, classify them defensibly, and keep the value consistent with your invoice and payment records. The cost breakdown guide covers this in more detail.
This is where Amazon sellers most often miscalculate. Slots run from two to ten days, longer in peak season, and are not controlled by the forwarder. Goods cleared, haulage arranged, and then stuck waiting for a slot is a scenario we see every peak season. The fix is to start booking the moment the goods clear customs rather than after collection, with labels, packing lists and shipment IDs prepared in advance. To confirm the destination address and postcode, use our FBA warehouse lookup.
Every figure here is an experience range, not a service commitment. Four points specifically: port-to-port ranges are measured from Shenzhen to the main UK ports, and other origins and destinations will differ; door-to-door ranges assume complete clearance documents, no restricted-goods complications and no examination; peak season, re-routing, industrial action and severe weather can all push actual timings well beyond these ranges; and the timing of any individual shipment is governed by the sailing or departure confirmed at booking and by the terms set out in the written quotation. For customs compliance and tax treatment, consult your UK broker or tax adviser.
Written by Alex · Operations, Shenzhen Xieshun Logistics Co., Ltd. · 5 years in international freight forwarding,
handling China–UK bookings, export declarations and UK-side clearance and delivery coordination.
Published · Last updated · Reviewed by the HSIEHSHUN commercial team
Questions We Answer Every Week
Send us the commodity, total weight and volume, UK delivery postcode and the date you need the goods available. We will come back with workable mode combinations and a door-to-door estimate on the basis set out above.